Projects

Our References

Presentation of Projects

2016-2018

Design, supply and installation in transformers (24 power transformers + Bindura phase + Auxiliary Services) of an Automatic Fire Sprinkler System at HCB – Songo Substation

2018

Design, supply and installation in transformers of an
Automatic Fire Sprinkler System at HCB - Matambo Substation

Hidroeléctrica de Cahora Bassa

2014 - 2015

Refurbishment of 32 Heat Exchangers and refurbishment of the “Cooling Tower” of HVDC thyristor tanks.

Massinga Substation (EDM) - Disconnectors Assembly (2016)

Songo Substation (HCB) - Installation of Smoothing Reactors (2014)

Central Hospital of Maputo - Installation of generator set, switchboard and minisubstation

EDM Power Station Temane - 2 x 2.6MVA Gas powered Generators Installed by Tecnel (2015)

CLN / VALE - Installation of a Rural Transformation Station for a 33kV power line (2012)

MOTRACO - Reactor being installed at the Maputo Substation (2011)

Hidroeléctrica de Cahora Bassa

2014 – 2015

Installation of 3 x 107MVA HVDC 535 / 600kV Transformers

Electricidade de Moçambique

2014

Expansion of the Salamanga Substation 66/33kV

Hidroeléctrica de Cahora Bassa

2012 - 2014

Replacement of the 6 HVDC smoothing reactors 535 kV of the 2 Poles, with new and more modern coils.

Corredor Logístico Integrado de Nacala

(CLN)

2012 - 2014

Supply of power lines and external lighting for camps A, B, C and for admin offices for the VALE’s Project.

Centro de Investigação em Saúde de Manhiça (CISM)

2012

Supply of permanent and emergency energy installations for CISM.

Electricidade de Moçambique

2011 - 2012

Reinforcement of the Medium Voltage Network of Maputo City

The Mozambique Transmission Company

(MOTRACO)

2011

Installation of 400kV AC Reactor