Projects
Our References
Hidroeléctrica de Cahora Bassa
2014 - 2015

Refurbishment of 32 Heat Exchangers and refurbishment of the “Cooling Tower” of HVDC thyristor tanks.

Massinga Substation (EDM) - Disconnectors Assembly (2016)
Central Hospital of Maputo - Installation of generator set, switchboard and minisubstation

Songo Substation (HCB) - Installation of Smoothing Reactors (2014)

EDM Power Station Temane - 2 x 2.6MVA Gas powered Generators Installed by Tecnel (2015)

CLN / VALE - Installation of a Rural Transformation Station for a 33kV power line (2012)

MOTRACO - The reactor being installed at the Maputo Substation (2011)
Hidroeléctrica de Cahora Bassa
2014 – 2015

Installation of 3 x 107MVA HVDC 535 / 600kV Transformers
Electricidade de Moçambique
2014

Expansion of the Salamanga Substation 66/33kV
Hidroeléctrica de Cahora Bassa
2012 - 2014

Replacement of the 6 HVDC smoothing reactors 535 kV of the 2 Poles, with new and more modern coils.
Corredor Logístico Integrado de Nacala
(CLN)
2012 - 2014


Supply of power lines and external lighting for camps A, B, C and for admin offices for the VALE’s Project.
Centro de Investigação em Saúde de Manhiça (CISM)
2012

Supply of permanent and emergency energy installations for CISM.
Electricidade de Moçambique
2011 - 2012

Reinforcement of the Medium Voltage Network of Maputo City
The Mozambique Transmission Company
(MOTRACO)
2011
Installation of 400kV AC Reactor